05Construction and infrastructure
Site inspections, RFIs and variations that do not get lost in WhatsApp
Work packages, site inspections, material requests, requests for information and variations as tracked tasks with owners, and a handover checklist at the end.

Starter setup
What the starter setup installs
Construction starter pack, version 1. Counted from the setup file itself.
In practice
How the work flows
01Site inspection
A Site Inspection task type and checklist, with an indicator for inspections passed first time.
02RFIs and variations
RFI and Variation / change request checklists, and an indicator for variations awaiting decision.
03Material requests
A Material Request type and checklist, with the purchasing register behind it.
04Snagging and handover
Statuses Planned, Mobilised, Snag and Handed over, a Handover checklist, and an open-snags indicator.
05Safety
A Safety incident checklist and a monthly safety-incidents indicator.
06Contracts and site work
An optional register for contract, project, work package, task and inspection.
The full list
Everything it adds, by category
Names are shown as they appear in the setup. You can rename or hide any of them after it is applied.
- Site Inspection
- RFI
- Material Request
- Variation
- Handover
- Safety Action
- Project Director
- Project Manager
- Site Engineer
- Site Supervisor
- Quantity Surveyor / Procurement
- Safety Officer
- Site inspection
- RFI
- Material request
- Variation / change request
- Handover
- Safety incident
- Open snags
- Inspections passed first time
- Open RFIs
- Overdue tasks
- Safety incidents this month
- Variations awaiting decision
- Project Management
- Site Operations
- Engineering & Design
- Procurement & Stores
- Quantity Surveying
- Health & Safety
- Administration
- Equipment & Plant
Made for
- Contractor
- Engineering consultancy
- Infrastructure developer
What to know
Where it stops
We would rather tell you now than have you find out in month three.
- It is not a bill-of-quantities or estimating tool, and it does not draw or manage drawings.
- Costs are planned or imported figures, not an accounting ledger.
Getting started
From sign-up to a working workspace
Choose your industry
Select your industry and type of organisation when you create the company.
Preview the setup
Read exactly what would be added. Nothing is applied yet.
Apply, then make it yours
Apply it, invite your team, and rename or hide anything that does not fit.
Questions
Common questions
Does it work on site with poor signal?
The Android app queues task changes made offline and sends them when the phone reconnects.
Can subcontractors use it?
They can be added as users with limited roles, subject to your plan limits.
What exactly does the starter setup add?
Only what is listed on this page: task types, statuses, labels, departments, roles with their access rules, checklists, KPIs and registers. You preview it first, and it only adds; anything with the same name is left alone.
Try the starter setup with your own work in it
Start a trial, or book a short walkthrough and bring a real example. We will set it up with you.
New companies start on a 14-day trial of the Growth plan.